Knowledge Base

Docs : resource-levels

→ Overview

Resource Levels

RackPeek organizes your infrastructure into three levels: Hardware, Systems, and Services. Understanding how these levels relate to each other is the key to modeling your homelab accurately.

Hardware is the physical layer (servers, switches, UPS units). Systems run on hardware or on other systems (hypervisors, VMs, containers). Services run on systems (apps, databases, network endpoints). The runs-on property connects them. Systems can nest to any depth, so you can model Proxmox hosting VMs hosting Docker containers.

The Three Levels

Every resource in RackPeek belongs to one of three levels. Each level builds on the one below it, connected by the runs-on relationship.

Hardware          The physical machines in your rack or on your desk.
  └── Systems     The operating systems, VMs, and containers running on that hardware.
       └── Services   The applications and network services running on those systems.

Think of it as: hardware is the metal, systems are what boot on it, and services are what your users actually connect to.


Hardware

Hardware represents the physical devices in your infrastructure. These are things you can touch — rack-mounted servers, network switches, Wi-Fi access points, UPS units, and workstations.

Hardware Types

Type What it represents Example
Server Rack or tower server Dell PowerEdge R730, custom Proxmox node
Switch Network switch UniFi USW-Pro-48-PoE
Router Network router MikroTik RB5009
Firewall Dedicated firewall appliance Netgate SG-3100, pfSense box
Access Point Wireless access point UniFi U6-Pro
Desktop Desktop workstation Custom build, Mac Mini
Laptop Laptop ThinkPad T14s
UPS Uninterruptible power supply APC SMT1500
Other Anything that doesn't fit an existing category Microwave radio bridge, KVM switch

Sub-Resources

Some hardware types support sub-resources that describe their internal components.

Sub-Resource Server Desktop Laptop Switch Router Firewall Access Point UPS Other
CPU Yes Yes Yes
Drive Yes Yes Yes
GPU Yes Yes Yes
NIC Yes Yes Yes
Port Yes Yes Yes Yes* Yes Yes
RAM Yes Yes Yes

* Access Point ports are editable in the web UI and in YAML, but have no rpk accesspoints port CLI branch yet.

NIC and Port are the same underlying sub-resource — they only differ in the CLI branch used to manage them. Compute kinds expose it as rpk <kind> nic, network and appliance kinds as rpk <kind> port. Either way the resource can be wired up with rpk connections add and shows up in rpk graph topology.

Hardware is the foundation. Nothing runs "on" hardware in the RackPeek sense — hardware just exists. Systems and services cannot be hardware; they live on top of it.

Adding Hardware

CLI

rpk servers add pve-01
rpk switches add usw-pro-48
rpk ups add apc-1500

Web UI

Navigate to Hardware and select the hardware type (e.g., Servers). Click Add Server and enter a name.


Systems

Systems represent the software environments that run on your hardware — or on other systems. A system is anything that provides an execution context: a hypervisor, a virtual machine, a container, a bare-metal OS installation, or a cloud instance.

System Types

Type What it represents Example
baremetal OS installed directly on hardware Debian on a dedicated server
hypervisor Virtualization platform Proxmox VE, ESXi, Hyper-V
vm Virtual machine Ubuntu VM on Proxmox
container Container or container runtime Docker container, LXC
embedded Firmware or embedded OS OPNsense on a firewall appliance
cloud Cloud-hosted instance AWS EC2, Hetzner VPS
cluster Logical compute cluster Kubernetes cluster, Docker Swarm cluster

| other | Anything that doesn't fit above | Custom runtime |

How Systems Connect

Every system has a runs-on property that defines where it lives. A system can run on:

  • Hardware — a hypervisor installed on a physical server, or a bare-metal OS on a desktop.
  • Another system — a VM running on a hypervisor, or a container running inside a VM.

Tip

You can nest systems. A hypervisor is a system that runs on hardware, and a VM is a system that runs on that hypervisor. There is no artificial limit to how deep you can nest. See Systems Running on Systems for a full worked example.

Adding Systems

CLI

rpk systems add proxmox-ve
rpk systems set proxmox-ve --type hypervisor --os "Proxmox VE 8.3" --runs-on pve-01

Web UI

Navigate to Systems, click Add System, and enter a name. Then open the system's detail page to set its type, OS, and runs-on target.


Services

Services represent the applications and network endpoints your systems provide. If a system is the platform, a service is what actually does the work — a web app, a database, a DNS server, a media streaming service.

Important

Services always run on systems. You cannot attach a service directly to hardware.

Service Properties

Property Description Example
IP Network address 10.0.10.50
Port Listening port 8096
Protocol Network protocol tcp, http
URL Access URL https://jellyfin.home.lab

Adding Services

CLI

rpk services add jellyfin
rpk services set jellyfin --runs-on media-vm --ip 10.0.10.50 --port 8096 --url https://jellyfin.home.lab

Web UI

Navigate to Services, click Add Service, and enter a name. Open the service's detail page to set its runs-on target and network details.


The Runs-On Relationship

runs-on is the glue that connects everything in RackPeek. It tells you what a resource depends on.

Rules

Resource Can run on
Hardware Nothing — hardware is the base layer
System Hardware or another System
Service System only

Note

A resource can have multiple runs-on targets. This handles cases like a clustered service that runs across several systems, or a VM that has been migrated between hosts.

Setting Runs-On

CLI

Use the --runs-on flag on the set command:

rpk systems set my-vm --runs-on proxmox-ve
rpk services set gitea --runs-on docker-host

To set multiple parents:

rpk systems set my-vm --runs-on proxmox-ve --runs-on proxmox-ve-02

Web UI

Open any system or service detail page. The runs-on field lets you pick from existing hardware or systems.


Systems Running on Systems

This is the most powerful part of the resource model and the one most often asked about. RackPeek fully supports nesting systems inside other systems, which is how you model real-world virtualization stacks.

The Problem

In a typical Proxmox homelab, your physical server runs a hypervisor, and that hypervisor runs VMs. Without nesting, you'd lose the hypervisor layer — VMs would appear to run directly on the bare metal, which doesn't reflect reality and makes it impossible to document important details about the hypervisor itself.

The Solution

Model every layer as its own system, each pointing runs-on to the layer below it:

pve-01 (Server)                      ← Hardware
  └── proxmox-ve (System: hypervisor) ← runs-on pve-01
       ├── media-vm (System: vm)      ← runs-on proxmox-ve
       ├── docker-vm (System: vm)     ← runs-on proxmox-ve
       └── pihole-lxc (System: container) ← runs-on proxmox-ve

Each system in this chain is a first-class resource. You can document its OS version, allocated RAM, CPU cores, drives, IP address, tags, labels, and notes — just like any other resource.

Worked Example: Proxmox Server with VMs and Services

This walks through modeling a common homelab setup from the ground up.

Step 1: Add the physical server.

rpk servers add pve-01

Step 2: Add the hypervisor and link it to the server.

rpk systems add proxmox-ve
rpk systems set proxmox-ve --type hypervisor --os "Proxmox VE 8.3" --runs-on pve-01

Step 3: Add VMs and containers that run on the hypervisor.

rpk systems add media-vm
rpk systems set media-vm --type vm --os "Ubuntu 24.04" --cores 4 --ram 8 --runs-on proxmox-ve

rpk systems add docker-vm
rpk systems set docker-vm --type vm --os "Debian 12" --cores 8 --ram 16 --runs-on proxmox-ve

rpk systems add pihole-lxc
rpk systems set pihole-lxc --type container --os "Alpine 3.21" --cores 1 --ram 512 --runs-on proxmox-ve

Step 4: Add services that run on those systems.

rpk services add jellyfin
rpk services set jellyfin --runs-on media-vm --port 8096 --url https://jellyfin.home.lab

rpk services add gitea
rpk services set gitea --runs-on docker-vm --port 3000 --url https://gitea.home.lab

rpk services add pihole
rpk services set pihole --runs-on pihole-lxc --port 80 --ip 10.0.10.3

The result is a complete picture:

pve-01 (Server)
  └── proxmox-ve (Hypervisor, Proxmox VE 8.3)
       ├── media-vm (VM, Ubuntu 24.04)
       │    └── jellyfin (:8096)
       ├── docker-vm (VM, Debian 12)
       │    └── gitea (:3000)
       └── pihole-lxc (Container, Alpine 3.21)
            └── pihole (:80)

Deeper Nesting

You can go further. If docker-vm runs Docker, and you want to model individual containers:

rpk systems add gitea-container
rpk systems set gitea-container --type container --runs-on docker-vm

rpk services add gitea
rpk services set gitea --runs-on gitea-container --port 3000

This gives you:

docker-vm (VM)
  └── gitea-container (Container)
       └── gitea (:3000)

There is no hard limit on depth. Model as many layers as you need to accurately represent your setup.


Choosing the Right Level

If you are unsure whether something should be hardware, a system, or a service, use this decision guide:

Question Answer Level
Can you physically touch it? Yes Hardware
Does it provide an execution environment (boots, runs processes)? Yes System
Does it listen on a port or provide a network endpoint? Yes Service
Is it virtualization software that hosts other systems? Yes System (type: hypervisor)
Is it a Docker container? Yes System (type: container)
Is it an app running inside a container or VM? Yes Service

Common Modeling Decisions

Proxmox / ESXi / Hyper-V — Model as a system with type hypervisor, running on the physical server.

Docker host — Model the host VM or bare-metal install as a system. Optionally model individual containers as nested systems.

Pi-hole / AdGuard Home — If it runs in an LXC container, model the container as a system and Pi-hole as a service on that system.

TrueNAS — Model as a system with type baremetal (or vm if virtualized), running on the NAS hardware. SMB, NFS, and iSCSI shares are services on that system.

OPNsense on a Netgate appliance — The Netgate box is hardware (firewall). OPNsense is a system with type embedded running on it.


Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please reload the page.